165. The completion technical program must contain(1) the name and contact information of the engineer responsible for the technical program;
(2) the name, profession and functions of the persons who prepared or revised the program;
(3) the classification of the well determined according to Schedule 1;
(4) a chronological and detailed description of the work to be carried out;
(5) the name and contact information of the enterprises charged with carrying out the work;
(6) a lateral section of the well indicating the technical elements;
(7) the type of service rig, equipment, components and casings to be used and their specifications;
(8) the type and name of the drilling installation, its registration number, the name of its owner and the estimated number of persons on board;
(9) the type of navigation equipment used and its specifications;
(10) the type and name of the vessel or platform used, its registration number, the name of its owner and the estimated number of persons on board;
(11) the type of navigation equipment used and its specifications;
(12) for every drilling, diving and accommodation installation, a compliance certificate issued by any of the following certification authorities:(a) the American Bureau of Shipping;
(b) the Bureau Veritas;
(c) DNV GL (Det Norske Veritas and Germanischer Lloyd);
(d) Lloyd’s Register North America Inc.;
(13) the demonstration that the drilling installations are designed, fabricated and constructed according to the generally recognized best practices;
(14) the design standards and a description of the immobilization system;
(15) if applicable, the home port and the location of the land base for storing material and products necessary for the work;
(16) the demonstration that the equipment, components and casings may withstand the different stresses to which they will be submitted, in particular, bursting, collapse and tension stresses;
(17) the demonstration that the local and regional geology and the presence of adjacent wellbores have been taken into consideration in the preparation of the program;
(18) the measures taken to ensure the integrity of the well;
(19) the type of completion;
(20) the degree of primary, secondary or tertiary petroleum recovery;
(21) the geological formations intersected and the depth of the intervals of each of the completion operations, in true vertical depth and in measured depth;
(22) the nature, composition and concentration of the fluids used and the total volume expected during the completion work;
(23) the demonstration that the fluid injection pressure will not reach the pressure for fracturing geological formations;
(24) the anticipated volume and flow of flow-back water;
(25) if applicable, the type of packers installed and the installation depths;
(26) if applicable, a casing perforation program indicating, in particular, the number and the type of perforations;
(27) if applicable, the list of the planned well logs;
(28) if applicable, the list of expected pressure and leak tests;
(29) if applicable, the list of expected injectivity tests;
(30) the measures planned for the management of petroleum, formation fluids, drilling fluids, chemical substances and other discharges;
(31) the meteorological and hydrographic conditions anticipated during the work;
(32) if applicable, a description of the ice management activities;
(33) the bathymetric map of the zone;
(34) the nature of the surface deposits and a description of the aquatic wildlife;
(35) the anticipated burning activities, the reasons justifying them and an estimate of the volume of gas burned;
(36) if a simulation or modelling has been carried out, a description of the simulation or modelling and the results obtained;
(37) if applicable, the list of licences, certificates and other authorizations to be obtained;
(38) the list of references used during the preparation of the technical program, in particular, the standards from recognized organizations and guidelines from other Canadian jurisdictions; and
(39) any other information or document deemed necessary by the Minister.